NRECA Case Study: Cuming County Public Power District Wind Project

Bluestem Energy Solutions developed, owns, and operates the tallest GE wind turbine in the state of Nebraska (along with its counterpart in Polk County). This single-turbine project in Cuming County near Wisner is a 2.5MW GE turbine with an 89-meter hub height and 127-meter rotor diameter. Cuming County Public Power District purchase electricity from the project, benefiting from power cost savings, a more diverse wholesale power mix, price certainty, and boosts to local tax coffers through economic development.